Sunday, October 26, 2014

Sprinkler controls fire at GE facility caused by malfunctioning electrical equipment (Charlottesville, VA)

Shortly before midnight on October 23, units responded to GE Intelligent Platforms, 2500 Austin Drive, for the report of a commercial structure fire. Fire crews worked to extinguish a fire in the second floor of the structure that had been controlled by the activation of one sprinkler head. There were no civilian or firefighter injuries as a result of the fire. The cause of the fire is accidental and was determined to be malfunctioning electrical equipment.

1 comment: